Power Management Application Form

Something something power management

Contact Information

Include information as entered in your ChargeLab CNM dashboard.

Electrical Infrastructure Documentation

Preferred documentation: Site electrical drawings.

Documentation must include:

  • Main panel at the point of grid interconnection, and any sub-panels below the main panel to which EV chargers are connected
    • Rating of the panels’ breakers (in amperage)
    • Panel names/identifiers
    • Site power supply type (3-phase, split-phase) and voltage
  • List of loads with the following information for each:
    • Load type: Managed charger or Unmanaged load
    • Load identifier (serial number or unmanaged load name)
    • Whether the load is connected to a dedicated breaker (and that breaker’s amps rating)
    • For unmanaged loads, the maximum continuous capable current (amps)